 First task...put down the rest of the subfloor... |
 ...and sealing the overhead.. |
 Starting to frame the corridor walls. |
 Sheetrock begins for the room walls. |
 Framing and utilities on the exterior walls. All the berthing room walls get sound insulation. |
 Another look at the interior walls, and lots of overhead conduit and ductwork. |
 Wall and utility finishing... |
 Installing this stuff well is an art...much trickier than regular wallpaper. |
 after the wall covering comes the ceiling, HVAC, fire alarm, lighting... |
 Finishing out the corridors... |
 Guess when this heater was installed! |