 At the front end, the bathrooms were framed first. |
 Installing and taping the greenboard. |
 Putting up the Marlite wall covering on the sink wall. |
 It is very important that these are properly installed :) |
 Starting the entrance from the corridor. |
 Cutting and framing the opening through the exterior wall panels. |
 A bit of creative reuse... |
 Building the wall for the SCBA lockers (it also hides the toilet plumbing). |
 The water fountain and those wall tiles. |
 The door frame for the entrance. |
 The lockers are installed, time to finish the floor. |