![MT MT](bargutted2.jpg) The upper floor is almost completely gutted.. |
![mind the steps mind the steps](stairdown2.jpg) taking down the stairway. |
![gone gone](nostair2.jpg) The stairwell was closed off so the second floor could be removed safely while still heating the first level. |
![upstairs upstairs](lastupstairs2.jpg) The sealed off upstairs just before the heat is turned off. |
![alpine adventures alpine adventures](sidingoff2.jpg) Meanwhile, the siding is removed. |
![Tyvek! Tyvek!](outsidewalls2.jpg) Almost stripped. Now things get more dramatic... |
![top down top down](upperdemo2.jpg) The lounge is gone, and the stairwell roof is happening. |
![open bar open bar](goinggoing2.jpg) Not much left of the second level. |
![sun deck sun deck](going2.jpg) Almost gone.... |
![duh, must have had a few too many duh, must have had a few too many](allgone2.jpg) The bar is history, folks. |
![cleanout cleanout](downstairs2.jpg) Downstairs, cleaning stuff out... |
![to the wall to the wall](gutting2.jpg) ...and gutting everything. |
![discommoding discommoding](head2.jpg) Everything... |
![beaners beaners](beakers2.jpg) Somewhere, this bit of graffiti showed up. |