The photos on this page are from Jerry Marty unless indicated otherwise:
|
|
|
Carpenters are at work on the kitchen walls at the beginning of December (information and credit). |
|
At the end of the summer, here is the dining room, ready for expected use the first week in February. But that was before the fire panel acted up, so occupancy was delayed for a month. |
A closer look at the serving line. |
One of the pod A1 berthing hallways. |
|
A view of fellow AST/RO w/o Karina Leppik's room as she moved in on 4 March. |
Looking out one of the new berthing room windows toward the dome. |
One of the new bathrooms...large, well ventilated, and not coed. |
The main second floor hallway outside the galley, looking toward the doors to the vertical tower at the end of the corridor. This photo was taken on 3 December 2002 (information and credit). |
Here's a view looking the other way at the new stairwell. |
Here's another look at the same hallway and stair, taken about a month later. The door at left is the galley exit from the dish pit area. |
Here's a view looking the other way at the new stairwell. |
Here's another look at the same hallway and stair, taken about a month later. The door at left is the galley exit from the dish pit area. |
Next, have a look at what was going on outside with the new construction. |